Refine your search:     
Report No.
 - 
Search Results: Records 1-7 displayed on this page of 7
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

None

*; *; *; *

JNC TJ3410 2000-021, 73 Pages, 2000/03

JNC-TJ3410-2000-021.pdf:52.78MB

no abstracts in English

JAEA Reports

None

*; *; *; *

JNC TJ3410 2000-020, 80 Pages, 2000/03

JNC-TJ3410-2000-020.pdf:41.34MB

no abstracts in English

JAEA Reports

None

;

PNC TN8410 97-223, 125 Pages, 1997/05

PNC-TN8410-97-223.pdf:6.42MB

None

JAEA Reports

ATR Data base 「Fugen」design/ R&D / characteristics [Safety Analysis]

PNC TJ1409 97-022, 53 Pages, 1997/03

PNC-TJ1409-97-022.pdf:1.18MB

1 Reflection of R&D Results, Design and Operation Experiences All knowledge obtain in the project, such as R&D results, design, operation experiences and so on, are tbe reflected to following items. 1) Improvement of safety and reliability in plant eration 2) Design modification of the plant 3) Design of the next plant 2 Basic Sndpoint for Data Base Composition "Design/R&D/Plant Performance Data Base" will be mposed ad shown in the following, so that the Data Base could be utilized for reflecng them to the above items and for improving the above items, effectively and efficitly. (1) United Data Bases of Design and R&D "Design/R&D/Plant Performance Data Ba" will be composed by uniting design data base and R&D data base, considering that t R&D of the project is mainly made in order to establish the design engineering and chnical basis, such as design policy, design criteria, design conditions, alloable dign limits, design verification, etc. (2) Addition of Initial Plant Performa

JAEA Reports

ATR Data base 「Fugen」 design/ R&D /characteristics [Thermal/Hydraulic]

PNC TJ1409 97-021, 27 Pages, 1997/03

PNC-TJ1409-97-021.pdf:0.59MB

1 Reflection of R&D Results, Design and Operation Experiences All knowledge obtain in the project, such as R&D results, design, operation experiences and so on, are tbe reflected to following items. 1) Improvement of safety and reliability in plant eration 2) Design modification of the plant 3) Design of the next plant 2 Basic Sndpoint for Data Base Composition "Design/R&D/Plant Performance Data Base" will be mposed ad shown in the following, so that the Data Base could be utilized for reflecng them to the above items and for improving the above items, effectively and efficitly. (1) United Data Bases of Design and R&D "Design/R&D/Plant Performance Data Ba" will be composed by uniting design data base and R&D data base, considering that t R&D of the project is mainly made in order to establish the design engineering and chnical basis, such as design policy, design criteria, design conditions, alloable dign limits, design verification, etc. (2) Addition of Initial Plant Performa

JAEA Reports

ATR Date Bese 「Fugen」 Design/R&D/Characteristics[Nuclear]

PNC TJ1409 97-020, 29 Pages, 1997/03

PNC-TJ1409-97-020.pdf:0.67MB

1 Reflection of R&D Results, Design and Operation Experiences All knowledge obtain in the project, such as R&D results, design, operation experiences and so on, are tbe reflected to following items. 1) Improvement of safety and reliability in plant eration 2) Design modification of the plant 3) Design of the next plant 2 Basic Sndpoint for Data Base Composition "Design/R&D/Plant Performance Data Base" will be mposed ad shown in the following, so that the Data Base could be utilized for reflecng them to the above items and for improving the above items, effectively and efficitly. (1) United Data Bases of Design and R&D "Design/R&D/Plant Performance Data Ba" will be composed by uniting design data base and R&D data base, considering that t R&D of the project is mainly made in order to establish the design engineering and chnical basis, such as design policy, design criteria, design conditions, alloabledesignlimits, design verification, etc. (2) Addition of Initial Plant Performa

7 (Records 1-7 displayed on this page)
  • 1